ITD Cementation (Adani) • Andhra Pradesh • 2026

Aerial view of the PSP Chitravathi Pumped Storage Project site in Andhra Pradesh, showing benched hard rock excavation and the reservoir alignment

Project overview

Hard rock excavation and controlled blasting for the Chitravathi Pumped Storage Project, executed for ITD Cementation (Adani) in Andhra Pradesh.

Key highlights

  • Hard rock benching and controlled blasting for the upper reservoir and waterway alignment
  • Vibration-controlled charge design near dam structures and existing infrastructure
  • Deployed hydraulic excavators, rock breakers and tippers for continuous mucking cycles
  • Slope profiling and stabilisation to design lines and levels
  • Daily production planning with client-integrated progress and safety reporting
  • Zero-harm execution with documented JSAs, permits and licensed blasting crew

Scope of work

  • Controlled blasting
  • Hard rock excavation
  • Slope stabilisation
  • Haulage and mucking

Key outcomes

Client
ITD Cementation
Location
Andhra Pradesh
Year
2026
All projects

Project gallery

Site photographs from the PSP Chitravathi Pumped Storage works. Select any image to view it larger.

Planning a blasting, drilling or excavation package?