Road Construction
Expressway Rock Cutting
Maharashtra · 2024

Project overview
Deep rock cuttings and slope stabilisation along a greenfield expressway alignment through basalt.
Scope of work
- Deep cuttings
- Slope trimming
- Vibration-controlled blasting
- Alignment
- 34 km
- Rock excavated
- 1.8 M cum
- Village complaints
- Nil
Key outcomes
Planning a blasting, drilling or excavation package?
Send us your scope and site conditions. Our engineering team responds with a method approach and indicative commercials within two working days.